Download Meeting Documents
Information: Third-Party Information Liability Disclaimer
Some of the information on this Web page has been provided by external sources. The Government of Canada is not responsible for the accuracy, reliability or currency of the information supplied by external sources. Content provided by external sources is not subject to official languages, privacy and accessibility requirements.
April 27, 2021 Commission Meeting
You can download all documents for April 27, 2021 Commission Meeting or download a single document.
April 27, 2021 Commission Meeting
January 21, 2021 Commission Meeting
You can download all documents for January 21, 2021 Commission Meeting or download a single document.
January 21, 2021 Commission Meeting
- Posted on January 13, 2021
- Posted on January 12, 2021
- Posted on January 11, 2021
- CMD 21-M5 – Presentation from CNSC staff on CNSC Readiness for the Regulation of Small Modular Reactors and Advanced Reactor Projects (PDF, 59 pages, 2364 KB)
- CMD 21-M7 – Submission from CNSC staff – Status Report on Power Reactors (PDF, 7 pages, 250 KB)
- CMD 21-M10 – Submission from CNSC staff – Event Initial Report for University of British Columbia (PDF, 4 pages, 244 KB)
- Posted on January 8, 2021
- CMD 21-M4 – Presentation from CNSC staff on condition of Pressure Tubes in Operating CANDU Reactors in Canada (PDF, 72 pages, 1402 KB)
- CMD 21-M8 – Submission from CNSC staff – Update on Event Initial Report for CancerCare Manitoba (PDF, 5 pages, 321 KB)
- CMD 21-M9 – Submission from CNSC staff – Update on Event Initial Report for Suncor Energy Inc. (PDF, 5 pages, 272 KB)
December 8-9-10, 2020 Commission Meeting
You can download all documents for December 8-9-10, 2020 Commission Meeting or download a single document.
December 8-9-10, 2020 Commission Meeting
- Posted on December 3, 2020
- CMD 20-M41 – Submission from CNSC Staff on the Status Report on Power Reactors (PDF, 6 pages, 125 KB)
- CMD 20-M24.A – Presentation from CNSC Staff on Regulatory Oversight Report for Nuclear Power Generating Sites in Canada : 2019 (PDF, 73 pages, 1.81 MB)
- CMD 20-M22.9 – Presentation from the Canadian Nuclear Laboratories (PDF, 25 pages, 4.45 MB)
- CMD 20-M25.B – Revised presentation from CNSC staff on the Regulatory Oversight Report for Uranium Mines and Mills in Canada: 2019 (PDF, 61 pages, 2.48 MB)
- CMD 20-M36.5A – Presentation from the Algonquins of Pikwakanagan First Nation (PDF, 18 pages, 1.73 MB)
- CMD 20-M22.5A – Presentation from the Manitoba Metis Federation (PDF, 28 pages, 2.13 MB)
- Posted on December 2, 2020
- CMD 20-M24.1A – Revised presentation from Ontario Power Generation on the Refurbishment Project at the Darlington Nuclear Generating Station (PDF, 36 pages, 2.96 MB)
- CMD 20-M24.B – Supplementary submission from CNSC Staff on Regulatory Oversight Report for Nuclear Power Generating Sites in Canada : 2019 (PDF, 19 pages, 309 KB)
- CMD 20-M22.B – Supplementary submission from CNSC staff on the Regulatory Oversight Report for Canadian Nuclear Laboratories Sites: 2019 (PDF, 57 pages, 791 KB)
- CMD 20-M22.C – Revised presentation from CNSC staff on the Regulatory Oversight Report for Canadian Nuclear Laboratories Sites: 2019 (PDF, 52 pages, 2.32 MB)
- CMD 20-M25.9A – Presentation from the Ya’thi Néné Land and Resource Office (PDF, 7 pages, 1.02 MB)
- CMD 20-M36.B – Supplementary submission from CNSC staff on the Regulatory Oversight Report for Uranium and Nuclear Substance Processing in Canada: 2019 (PDF, 51 pages, 624 KB)
- CMD 20-M36.C – Revised presentation from CNSC staff on the Regulatory Oversight Report for Uranium and Nuclear Substance Processing in Canada: 2019 (PDF, 61 pages, 3.51 MB)
- Posted on November 20, 2020
- Posted on November 18, 2020
- CMD 20-M24.2 – Submission from the Grand Conseil de la Nation Waban-Aki (PDF, 4 pages, 252 KB)
- CMD 20-M24.3 – Submission from the Curve Lake First Nation (PDF, 11 pages, 427 KB)
- CMD 20-M24.4 – Submission from the Canadian Environmental Law Association (PDF, 49 pages, 784 KB)
- CMD 20-M24.5 – Submission from Swim Drink Fish Canada / Lake Ontario Waterkeeper (PDF, 17 pages, 276 KB)
- CMD 20-M24.6 – Submission from Gordon W. Dalzell (PDF, 33 pages, 868 KB)
- CMD 20-M24.7 – Submission from the Canadian Nuclear Workers’ Council (PDF, 5 pages, 635 KB)
- CMD 20-M24.8 – Submission from the Power Workers’ Union (PDF, 8 pages, 360 KB)
- CMD 20-M25.1 – Submission from the Saskatchewan Mining Association (PDF, 4 pages, 283 KB)
- CMD 20-M25.2 – Submission from the Canadian Environmental Law Association (PDF, 17 pages, 642 KB)
- CMD 20-M25.3 – Submission from the Kineepik Métis Local #9 (PDF, 4 pages, 1.42 MB)
- CMD 20-M25.4 – Submission from the Northern Saskatchewan Environmental Quality Committee (PDF, 4 pages, 459 KB)
- CMD 20-M25.5 – Submission from the Lac La Ronge Indian Band and Kitsaki Management Limited Partnership (PDF, 5 pages, 272 KB)
- CMD 20-M25.6 – Submission from the Athabasca Joint Engagement and Environmental Subcommittee (PDF, 5 pages, 1.09 MB)
- CMD 20-M25.7 – Submission from the English River First Nation (PDF, 4 pages, 273 KB)
- CMD 20-M25.8 – Submission from the Canadian Nuclear Workers’ Council (PDF, 4 pages, 627 KB)
- CMD 20-M22.1 – Submission from the Curve Lake First Nation (PDF, 11 pages, 339 KB)
- CMD 20-M22.2 – Submission from Concerned Citizens of Renfrew County and Area (PDF, 13 pages, 700 KB)
- CMD 20-M22.3 – Submission from the Canadian Nuclear Workers’ Council (PDF, 4 pages, 630 KB)
- CMD 20-M22.4 – Submission from the Canadian Environmental Law Association (PDF, 23 pages, 428 KB)
- CMD 20-M22.5 – Submission from the Manitoba Metis Federation (PDF, 42 pages, 955 KB)
- CMD 20-M22.6 – Submission from the Algonquins of Ontario (PDF, 18 pages, 543 KB)
- CMD 20-M22.7 – Submission from the Power Workers’ Union (PDF, 4 pages, 378 KB)
- CMD 20-M36.2 – Submission from the Curve Lake First Nation (PDF, 11 pages, 428 KB)
- CMD 20-M36.3 – Submission from the Canadian Nuclear Laboratories (PDF, 4 pages, 826 KB)
- CMD 20-M36.4 – Submission from the Canadian Environmental Law Association (PDF, 16 pages, 393 KB)
- CMD 20-M36.5 – Submission from the Algonquins of Pikwakanagan First Nation (PDF, 13 pages, 501 KB)
- CMD 20-M36.6 – Submission from Swim Drink Fish Canada / Lake Ontario Waterkeeper (PDF, 20 pages, 402 KB)
- CMD 20-M36.7 – Submission from the Algonquins of Ontario (PDF, 20 pages, 590 KB)
- CMD 20-M36.8 – Submission from the Canadian Nuclear Workers’ Council (PDF, 4 pages, 630 KB)
- CMD 20-M36.9 – Submission from the Municipality of Port Hope (PDF, 4 pages, 247 KB)
- Posted on October 6, 2020
- CMD 20-M24 – Submission from CNSC Staff – Regulatory Oversight Report for Nuclear Power Generating Sites in Canada: 2019 (PDF, 219 pages, 3.3 MB)
- CMD 20-M36 – Submission from CNSC Staff – Regulatory Oversight Report for Uranium and Nuclear Substance Processing Facilities in Canada: 2019 (PDF, 100 pages, 1.83 MB)
- CMD 20-M36.A – Presentation from CNSC Staff – Regulatory Oversight Report for Uranium and Nuclear Substance Processing Facilities in Canada: 2019 (PDF, 58 pages, 3.23 MB)
- CMD 20-M36.1 – Presentation from Cameco Corporation – Update on its Vision in Motion (VIM) project (PDF, 23 pages, 1.42 MB)
- Posted on October 5, 2020
- CMD 20-M22 – Submission from CNSC Staff - Regulatory Oversight Report for Canadian Nuclear Laboratories (CNL) Sites: 2019 (PDF, 67 pages, 1.51 MB)
- CMD 20-M22.A – Presentation from CNSC Staff - Regulatory Oversight Report for Canadian Nuclear Laboratories (CNL) Sites: 2019 (PDF, 47 pages, 2.26 MB)
- CMD 20-M24.1 – Presentation from Ontario Power Generation – Update on the Refurbishment Project at the Darlington Nuclear Generating Station (PDF, 34 pages, 3.89 MB)
- CMD 20-M25 – Submission from CNSC Staff – Regulatory Oversight Report for Operating Uranium Mines and Mills in Canada: 2019 (PDF, 37 pages, 1.29 MB)
- CMD 20-M25.A – Presentation from CNSC Staff – Regulatory Oversight Report for Operating Uranium Mines and Mills in Canada: 2019 (PDF, 39 pages, 2.36 MB)
November 5, 2020 Commission Meeting
You can download all documents for November 5, 2020 Commission Meeting or download a single document.
November 5, 2020 Commission Meeting
- Posted on October 29, 2020
- CMD 20-M23.A – Presentation from CNSC staff on DNSR and Class IB ROR (PDF, 93 pages, 3.39 MB)
- CMD 20-M35.A – Presentation from CNSC staff on REGDOC-2.2.4, Fitness for Duty, Volume II: Managing Alcohol and Drug Use, version 3 (PDF, 23 pages, 0.97 MB)
- CMD 20-M34 – Submission from CNSC Staff on the Status Report on Power Reactors (PDF, 7 pages, 232 KB)
- Posted on October 28, 2020
- Posted on October 23, 2020
- Posted on October 14, 2020
- Posted on September 2, 2020
September 16, 2020 Commission Meeting
You can download all documents for September 16, 2020 Commission Meeting or download a single document.
September 16, 2020 Commission Meeting
- Posted on September 15, 2020
- Posted on September 11, 2020
- Posted on September 10, 2020
- Posted on September 3, 2020
- CMD 20-M27 – Submission from CNSC Staff on the Event initial Report for the Exposure above regulatory limit of a non-Nuclear Energy Worker at CancerCare Manitoba (PDF, 3 pages, 370 KB)
- CMD 20-M29 – Submission from CNSC Staff on the Event Initial Report for a fire at Suncor Energy Inc., Tar Island location (PDF, 3 pages, 364 KB)
June 17-18, 2020 Commission Meeting
You can download all documents for June 17-18, 2020 Commission Meeting or download a single document.
June 17-18, 2020 Commission Meeting
- Posted on June 12, 2020
- Posted on June 11, 2020
- Posted on June 10, 2020
- CMD 20-M9 – Presentation from CNSC Staff concerning the 2019 Integrated Regulatory Review Service (IRRS) Mission (PDF, 79 pages, 3.12 MB)
- CMD 20-M11 – Presentation from CNSC Staff concerning the January 12, 2020 false alert by Emergency Management Ontario for the Pickering Nuclear Generating Station (PDF, 21 pages, 1.8 MB)
- CMD 20-M11.A – Supplementary submission from CNSC Staff concerning the January 12, 2020 false alert (Report from Global Public Affairs and Management Response) (PDF, 42 pages, 1.6 MB)
- CMD 20-M13.B – Presentation from CNSC staff on Waste and Decommissioning Regulatory Documents (PDF, 37 pages, 1.92 MB)
- CMD 20-M14 – Presentation from CNSC Staff concerning the June 2019 International Atomic Energy Agency (IAEA) Emergency Preparedness Review Mission to Canada - Mission Findings and Canada's Response (PDF, 35 pages, 2.31 MB)
- CMD 20-M15 – Presentation from the Independent Electricity System Operator (IESO) on the duties and role of the IESO in Ontario, with focus on the supply gap identified in the IESO's 2017 Long Term Energy Plan and the impact on nuclear power plants (PDF, 9 pages, 840 KB)
- CMD 20-M17 – Submission from CNSC Staff - Event Initial Report - Exposure above regulatory limit of Nuclear Energy Worker at Alberta Health Services (PDF, 4 pages, 223 KB)
- Posted on June 3, 2020
March 3, 2020 Commission Meeting
You can download all documents for March 3, 2020 Commission Meeting or download a single document.
March 3, 2020 Commission Meeting
- Posted on February 27, 2020
December 11-12, 2019 Commission Meeting
You can download all documents for December 11-12, 2019 meeting or download a single document.
December 11-12, 2019 Commission Meeting
- Published on December 10, 2019
- Published on December 6, 2019
- CMD 19-M35.A – Presentation from CNSC staff on the Regulatory Oversight Report on Uranium and Nuclear Processing Facilities in Canada: 2018 (PDF, 78 pages, 3.82 MB)
- CMD 19-M36.A – Presentation from CNSC staff on the Regulatory Oversight Report on Uranium Mines and Mills in Canada: 2018 (PDF, 74 pages, 2.81 MB)
- CMD 19-M36.6A – Presentation from the Ya’thi Néné Land and Resource Office (PDF, 9 pages, 364 KB)
- CMD 19-M42 – Presentation from CNSC staff on Update on Independent Environmental Monitoring Program (IEMP) (PDF, 22 pages, 2.74 MB)
- CMD 19-M47.A – Presentation from CNSC staff on REGDOC-3.1.3 (PDF, 24 pages, 977 KB)
- CMD 19-M49 – Follow up from May 30, 2018 public hearing on Bruce Power’s licence renewal (PDF, 12 pages, 4.00 MB)
- Published on November 27, 2019
- Published on November 15, 2019
- Published on November 14, 2019
- CMD 19-M35.1 – Submission from the Canadian Nuclear Association (PDF, 3 pages, 370 KB)
- CMD 19-M35.2 – Submission from the Canadian Nuclear Workers’ Council (PDF, 4 pages, 732 KB)
- CMD 19-M35.3 – Submission from Swim Drink Fish Canada / Lake Ontario Waterkeeper (PDF, 71 pages, 971 KB)
- CMD 19-M36.1 – Submission from the Saskatchewan Mining Association (PDF, 3 pages, 237 KB)
- CMD 19-M36.2 – Submission from the Prince Albert Grand Council (PDF, 9 pages, 196 KB)
- CMD 19-M36.3 – Submission from the Northern Saskatchewan Environmental Quality Committee (PDF, 4 pages, 408 KB)
- CMD 19-M36.4 – Submission from the Canadian Nuclear Association (PDF, 3 pages, 369 KB)
- CMD 19-M36.5 – Submission from the Canadian Nuclear Workers’ Council (PDF, 4 pages, 466 KB)
- CMD 19-M36.6 – Submission from the Ya’thi Néné Land and Resource Office (PDF, 8 pages, 433 KB)
- CMD 19-M36.7 – Submission from the English River First Nation (PDF, 18 pages, 979 KB)
- CMD 19-M36.8 – Submission from the Canadian Environmental Law Association on behalf of Christie Simon (PDF, 17 pages, 373 KB)
- Published on October 11, 2019
- CMD 19-M35 – Submission from CNSC Staff on the Regulatory Oversight Report for Uranium and Nuclear Substance Processing Facilities in Canada: 2018 (PDF, 175 pages, 3.78 MB)
- CMD 19-M36 – Submission from CNSC Staff on the Regulatory Oversight Report for Uranium Mines and Mills in Canada: 2018 (PDF, 159 pages, 3.45 MB)
November 6-7, 2019 Commission Meeting
You can download all documents for November 6 and 7, 2019 meeting or download a single document.
November 6-7, 2019 Commission Meeting
- Published on November 1, 2019
- Published on October 31, 2019
- CMD 19-M43 – Submission from CNSC Staff on Status of Digital Control Computer Systems – Action Item #19298 (PDF, 10 pages, 1.34 MB)
- CMD 19-M30.A – Supplementary submission from CNSC staff on the Regulatory Oversight Report for Canadian Nuclear Power Generating Sites: 2018 (PDF, 34 pages, 866 KB)
- CMD 19-M30.B – Presentation from CNSC staff on the Regulatory Oversight Report for Canadian Nuclear Power Generating Sites: 2018 (PDF, 49 pages, 937 KB)
- CMD 19-M30.6A – Supplementary submission from Swim Drink Fish Canada / Lake Ontario Waterkeeper (PDF, 93 pages, 1.18 MB)
- CMD 19-M39 – Presentation from CNSC staff on the 2019 Annual Program Report, Regulatory Framework Program (PDF, 33 pages, 1.39 MB)
- CMD 19-M40 – Presentation by the CSA Group (PDF, 17 pages, 1.43 MB)
- CMD 19-M29.A – Presentation by CNSC Staff on the Regulatory Oversight Report on the Use of Nuclear Substances in Canada: 2018 (PDF, 74 pages, 3.05 MB)
- CMD 19-M29.B – Supplementary submission from CNSC staff on the Regulatory Oversight Report on the Use of Nuclear Substances in Canada: 2018 (PDF, 17 pages, 730 KB)
- CMD 19-M24.A – Presentation from CNSC staff on the Regulatory Oversight Report for Canadian Nuclear Laboratories (CNL) Sites: 2018 (PDF, 117 pages, 3.99 MB)
- CMD 19-M24.5A – Supplementary submission from the Manitoba Metis Federation (PDF, 35 pages, 4.41 MB)
- CMD 19-M24.7A – Supplementary submission from Lake Ontario Waterkeeper and Ottawa Riverkeeper (PDF, 36 pages, 5.88 MB)
- CMD 19-M24.10A – Revised submission from the Kebaowek First Nation (PDF, 16 pages, 1.54 MB)
- CMD 19-M24.10B – Presentation from the Kebaowek First Nation (PDF, 21 pages, 14.2 MB)
- Published on October 17, 2019
- Published on October 15, 2019
- Published on October 11, 2019
- Published on October 10, 2019
- CMD 19-M29.1 – Submission from Benoit Robert Poulet (PDF, 9 pages, 220 KB)
- CMD 19-M29.2 – Submission from the Canadian Radiation Protection Association (PDF, 7 pages, 142 KB)
- CMD 19-M30.1 – Submission from Benoit Robert Poulet (PDF, 14 pages, 270 KB)
- CMD 19-M30.2 – Submission from Frank R. Greening (PDF, 10 pages, 474 KB)
- CMD 19-M30.2A – Supplementary submission from Frank R. Greening (PDF, 6 pages, 208 KB)
- CMD 19-M30.3 – Submission from the Grand Conseil de la Nation Waban-Aki (PDF, 5 pages, 329 KB)
- CMD 19-M30.4 – Submission from the Canadian Nuclear Workers’ Council (PDF, 4 pages, 609 KB)
- CMD 19-M30.5 – Submission from the Power Workers’ Union (PDF, 4 pages, 151 KB)
- CMD 19-M30.6 – Submission from Swim Drink Fish Canada / Lake Ontario Waterkeeper (PDF, 17 pages, 333 KB)
- CMD 19-M30.7 – Submission from the Canadian Environmental Law Association (PDF, 24 pages, 555 KB)
- CMD 19-M24.2 – Submission from Algonquins of Ontario (PDF, 25 pages, 435 KB)
- CMD 19-M24.3 – Submission from the Municipality of Port Hope (PDF, 4 pages, 163 KB)
- CMD 19-M24.4 – Submission from the Power Workers’ Union (PDF, 4 pages, 148 KB)
- CMD 19-M24.5 – Submission from the Manitoba Metis Federation (PDF, 58 pages, 2.09 MB)
- CMD 19-M24.6 – Submission from the Canadian Environmental Law Association (PDF, 17 pages, 390 KB)
- CMD 19-M24.7 – Submission from Lake Ontario Waterkeeper and Ottawa Riverkeeper (PDF, 65 pages, 7.92 MB)
- CMD 19-M24.8 – Submission from the Canadian Nuclear Workers’ Council (PDF, 5 pages, 628 KB)
- CMD 19-M24.9 – Submission from Concerned Citizens of Renfrew County and Area (PDF, 39 pages, 4.77 MB)
- CMD 19-M24.10 – Submission from the Kebaowek First Nation (PDF, 16 pages, 1.53 MB)
- Published on September 9, 2019
- Published on September 6, 2019
- Published on September 5, 2019
October 3, 2019 Commission Meeting
You can download all documents for October 3, 2019 meeting or download a single document.
October 3, 2019 Commission Meeting
May 15, 2019 Commission Meeting
You can download all documents for May 15, 2019 meeting or download a single document.
May 15, 2019 Commission Meeting
- Published on May 13, 2019
- Published on May 9, 2019
- Published on April 24, 2019
- Published on April 17, 2019
- CMD 19-M15 – Response to Action Item from November 8, 2018 Meeting – To report in future Regulatory Oversight Reports the total recordable injury frequency, including contractors data (PDF, 4 pages, 127 KB)
- CMD 19-M16 – Response to Action Item from May 2018 public hearing – To make available for the public the volume of waste that will be produced during the major component replacement (MCR) of the six units at the Bruce Nuclear Generating Station (PDF, 4 pages, 708 KB)
- CMD 19-M17 – Response to Action Item from December 12-13, 2018 Meeting – Update on the guideline for uranium in ambient air and groundwater (PDF, 11 pages, 390 KB)
- CMD 19-M18 – Response to Action Item from December 12-13, 2018 Meeting – Update on Event Initial Report for Isologic Innovative Radiopharmaceuticals – International Nuclear and Radiological Event Scale (INES) rating (PDF, 3 pages, 137 KB)
February 20, 2019 Commission Meeting
You can download all documents for February 20, 2019 meeting or download a single document.
February 20, 2019 Commission Meeting
- Posted on April 8, 2019
- Posted on February 1, 2019
- Posted on February 8, 2019
- CMD 19-M6 – Presentation from CNSC staff on the update on OPG Darlington Unit 2 Process for the return to service (PDF, 19 pages, 592 KB)
- CMD 19-M6.1 – Presentation from OPG on the update on Darlington Unit 2 Process for the return to service (PDF, 32 pages, 3,224 KB)
- CMD 19-M7 – Submission from CNSC staff on the update to the Darlington Nuclear Generating Station Alpha Event (PDF, 30 pages, 479 KB)
- Posted on February 14, 2019
- Posted on February 15, 2019
- CMD 19-M4 – Status Report on Power Reactors (PDF, 9 pages, 203 KB)
- CMD 19-M9 – Submission from CNSC staff for the Event Initial Report on worker injured at the CNL's Port Granby Project (PDF, 6 pages, 1071 KB)
- CMD 19-M10 – Submission from CNSC staff for the Event Initial Report on the power outage at CNL's Chalk River Laboratories (PDF, 7 pages, 1578 KB)
December 12-13, 2018 Commission Meeting
You can download all documents for December 12-13, 2018 meeting or download a single document.
December 12-13, 2018 Commission Meeting
- Posted on December 12, 2018
- Posted on December 13, 2018
- Posted on December 11, 2018
- CMD 18-M62 – Bruce Power - Transformer Fire and Mineral Oil Leak at Unit 8 of Bruce B Nuclear Generating Station (PDF, 6 pages, 516 KB)
- CMD 18-M62.1 – Presentation from Bruce Power on Event Initial Report for Transformer Fire and Mineral Oil Leak at Unit 8 of Bruce B Nuclear Generating Station (PDF, 9 pages, 1811 KB)
- Posted on December 7, 2018
- CMD 18-M55.1A – Presentation from Ontario Power Generation on the Mid-Term Report for OPG Darlington New Nuclear Project (PDF, 22 pages, 2829 KB)
- CMD 18-M48.A – Presentation from CNSC staff on the Regulatory Oversight Report for Uranium Mines, Mills, Historic and Decommissioned Sites in Canada: 2017 (PDF, 167 pages, 6105 KB)
- CMD 18-M48.7A – Revised submission from the Prince Albert Grand Councill (PDF, 31 pages, 1810 KB)
- CMD 18-M48.10A – Presentation from Sagamok Anishnawbek (PDF, 13 pages, 179 KB)
- CMD 18-M47.A – Presentation from CNSC staff on the Regulatory Oversight Report for Uranium and Nuclear Substance Processing Facilities in Canada: 2017 (PDF, 117 pages, 3049 KB)
- CMD 18-M63 – Status Report on Power Reactors (PDF, 5 pages, 106 KB)
- CMD 18-M64.A – Presentation from CNSC staff on Establishing new classes of licence for the regulation of hadron therapy facilities (PDF, 29 pages, 1022 KB)
- Posted on December 5, 2018
- CMD 18-M55.A – Presentation from CNSC staff on the Mid-Term Report for OPG Darlington New Nuclear Project (PDF, 26 pages, 1169 KB)
- CMD 18-M65 – Event Initial Report on Exceedance of the regulatory dose limit for extremities by a Nuclear Energy Worker at Isologic Innovative Pharmaceuticals (PDF, 8 pages, 598 KB)
- Posted on December 4, 2018
- Posted on November 28, 2018
- CMD 18-M47.4 – Submission from Sagamok Anishnawbek (PDF, 26 pages, 367 KB)
- CMD 18-M48.10 – Submission from Sagamok Anishnawbek (PDF, 26 pages, 367 KB)
- CMD 18-M48.11 – Submission from the Athabasca Chipewyan First Nation (PDF, 4 pages, 122 KB)
- CMD 18-M48.12 – Submission from the Algonquins of Ontario (PDF, 82 pages, 13549 KB)
- CMD 18-M55 – Submission from CNSC staff on the Mid-Term Report for OPG Darlington New Nuclear Project (PDF, 64 pages, 404 KB)
- CMD 18-M64 – Submission from CNSC on Establishing new classes of licence for the regulation of hadron therapy facilities (PDF, 23 pages, 328 KB)
- CMD 18-M65 –Submission from CNSC Staff on Event Initial Report for Isologic Innovative Radiopharmaceuticals (PDF, 61 pages, 1888 KB)
- Posted on November 20, 2018
- Posted on November 15, 2018
- CMD 18-M48.1 – Submission from the Athabasca Joint Engagement and Environmental Subcommittee (PDF, 6 pages, 537 KB)
- CMD 18-M48.2 – Submission from the Métis Community of Pinehouse (PDF, 4 pages, 1137 KB)
- CMD 18-M48.3 – Submission from the Canadian Nuclear Workers' Council (PDF, 4 pages, 421 KB)
- CMD 18-M48.4 – Submission from the English River First Nation (PDF, 21 pages, 697 KB)
- CMD 18-M48.5 – Submission from the Ya’thi Néné Land and Resource Office (PDF, 8 pages, 500 KB)
- CMD 18-M48.6 – Submission from the Saskatchewan Environmental Society (PDF, 16 pages, 673 KB)
- CMD 18-M48.7 – Submission from the Prince Albert Grand Council (PDF, 11 pages, 490 KB)
- CMD 18-M48.8 – Submission from the Canadian Environmental Law Association (PDF, 8 pages, 742 KB)
- CMD 18-M47.1 – Submission from the Canadian Nuclear Workers’ Council (PDF, 4 pages, 503 KB)
- CMD 18-M47.2 – Submission from Northwatch (PDF, 24 pages, 6788 KB)
- CMD 18-M55.1 – Submission from Ontario Power Generation on the Mid-Term Report on Darlington New Nuclear Project (PDF, 54 pages, 2893 KB)
- Posted on October 9, 2018
November 8, 2018 Commission Meeting
You can download all documents for November 8, 2018 meeting or download a single document.
November 8, 2018 Commission Meeting
- Posted on December 12, 2018
- Posted on November 2, 2018
- CMD 18-M58 – Status Report on Power Reactors (PDF, 10 pages, 619 KB)
- CMD 18-M39.A – Supplementary submission from CNSC Staff on the Regulatory Oversight Report for Canadian Nuclear Power Generating Sites: 2017 (PDF, 28 pages, 241 KB)
- CMD 18-M39.B – Presentation from CNSC Staff on the Regulatory Oversight Report for Canadian Nuclear Power Generating Sites: 2017 (PDF, 73 pages, 2789 KB)
- Posted on October 16, 2018
- Posted on October 12, 2018
- CMD 18-M39.1 – Submission from the Canadian Nuclear Workers' Council (PDF, 4 pages, 619 KB)
- CMD 18-M39.2 – Submission from the Power Workers' Union (PDF, 4 pages, 70 KB)
- CMD 18-M39.3 – Submission from SOS Great Lakes (PDF, 5 pages, 165 KB)
- CMD 18-M39.4 – Submission from Gordon W. Dalzell (PDF, 59 pages, 217 KB)
October 3-4, 2018 Commission Meeting
You can download all documents for October 3-4, 2018 meeting or download a single document.
October 3-4 2018 Commission Meeting
- Posted on September 28, 2018
- Posted on September 26, 2018
- CMD 18-M37.A – Presentation from CNSC Staff on the Regulatory Oversight Report on the Use of Nuclear Substances in Canada: 2017 (PDF, 68 pages, 2162 KB)
- CMD 18-M38.A – Presentation from CNSC Staff on the Overview of the Institutional Control Program for Decommissioned Mine and/or Mill Sites in Saskatchewan (PDF, 38 pages, 1072 KB)
- CMD 18-M40.A – Presentation from CNSC Staff on Regulatory Safety Oversight Culture Assessment (PDF, 28 pages, 607 KB)
- CMD 18-M49 – Presentation from CNSC Staff (including videos) – Technical Briefing on Nuclear Substances in Canada (PDF, 77 pages, 374 MB)
- CMD 18-M49 – Presentation from CNSC Staff (Without videos) – Technical Briefing on Nuclear Substances in Canada (PDF, 77 pages, 11 MB)
- CMD 18-M54 – Presentation from CNSC Staff of the 2018 Annual Program Report, Regulatory Framework Program (PDF, 32 pages, 1025 KB)
- Posted on September 19, 2018
- Posted on September 12, 2018
- Posted of September 10, 2018
- Posted on August 3, 2018
August 22-23, 2018 Commission Meeting
You can download all documents for August 22-23, 2018 meeting or download a single document.
August 22-23, 2018 Commission Meeting
- CMD 18-M30 – Progress Update from CNSC Staff for CNL's Prototype Waste Facilites, Whiteshell Laboratories and PHAI (PDF, 53 pages, 2963 KB)
- CMD 18-M30.A – Presentation from CNSC Staff on Progress Update for CNL's Prototype Waste Facilities, Whiteshell Laboratories and PHAI (PDF, 88 pages, 6297 KB)
- CMD 18-M30-1 – Presentation from the Canadian Nuclear Laboratories (PDF, 73 pages, 12553 KB)
- CMD 18-M30-2 – Written submission from the Concerned Citizens of Renfrew County and Area (PDF, 5 pages, 128 KB)
- CMD 18-M30-3 – Written submission from Dan Rudka (PDF, 11 pages, 418 KB)
- CMD 18-M30-4 – Written submission from Northwatch (PDF, 6 pages, 397 KB)
- CMD 18-M30-5 – Written submission from the Port Hope Community Health Concerns Committee (PDF, 54 pages, 3982 KB)
- CMD 18-M30-6 – Written submission from Faye More (PDF, 43 pages, 5132 KB)
- CMD 18-M30-7 – Written submission from Philippe Giroul (PDF, 12 pages, 382 KB)
- CMD 18-M31 – Presentation from CNSC Staff: Update on the Development, Deployment and Regulation of Small Modular Reactors (PDF, 48 pages, 1853 KB)
- CMD 18-M32 – Submission from CNSC staff on the Regulatory Oversight Report for Research Reactors and Class IB Accelerators: 2016-2017 (PDF, 93 pages, 2579 KB)
- CMD 18-M32.A – Presentation from CNSC staff on the Regulatory Oversight Report for Research Reactors and Class IB Accelerators: 2016-2017 (PDF, 76 pages, 1895 KB)
- CMD 18-M41 – Status Report on Power Reactors and update on internal contamination event at Darlington (PDF, 9 pages, 253 KB)
- CMD 18-M41-1 – Presentation from Ontario Power Generation on the Update on internal contamination event at Darlington(PDF, 11 pages, 494 KB)
- CMD 18-M42 – Presentation from CNSC staff on the 6th Review Meeting of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management (PDF, 4 pages, 230 KB)
- CMD 18-M43 – Event Initial Report for Air Canada - Overexposure to a member of the public during transport of packages containing nuclear substances (PDF, 4 pages, 230 KB)
- CMD 18-M44 – Event Initial Report - OPG Pickering - Unplanned outage due to algae run (PDF, 6 pages, 654 KB)
- CMD 18-M45.A - Event Initial Report - OPG Pickering - Unplanned outage due to condenser cooling backpressure (PDF, 4 pages, 366 KB)
- CMD 18-M46 - Event Initial Report - McMaster University - Personal contamination incident (PDF, 4 pages, 366 KB)
June 25, 2018 Commission Meeting
You can download all documents for June 25, 2018 meeting or download a single document.
June 25, 2018 Commission Meeting
May 28, 2018 Commission Meeting
You can download all documents for May 28, 2018 meeting or download a single document.
May 28, 2018 Commission Meeting
April 4, 2018 Commission Meeting
You can download all documents for April 4 2018 meeting or download a single document.
March 15, 2018 Commission Meeting
You can download all documents for March 15, 2018 meeting or download a single document.
March 15, 2018 Commission Meeting
- CMD 18-M9 – Status Report on Power Reactors (PDF, 5 pages, 1430 KB)
- CMD 18-M10 – Status of Designated Officer Program: 2016 (PDF, 29 pages, 310 KB)
- CMD 18-M10.A – Presentation on the Status of Designated Officer Program: 2016 (PDF, 22 pages, 427 KB)
- CMD 18-M11 – REGDOC-2.1.2, Safety Culture (PDF, 339 pages, 3774 KB)
- CMD 18-M11.A – Presentation on the REGDOC-2.1.2, Safety Culture (PDF, 35 pages, 531 KB)
- CMD 18-M12 – REGDOC-1.1.1, Licence to prepare site and site evaluation for new reactor facilities (PDF, 421 pages, 2229 KB)
- CMD 18-M12.A – Presentation on the REGDOC-1.1.1, Licence to prepare site and site evaluation for new reactor facilities (PDF, 32 pages, 526 KB)
- CMD 18-M13 – Event Initial Report for Bruce Power on failure of the primary heat transport pump seals at Bruce A Unit 4 (PDF, 7 pages, 3460 KB)
- CMD 18-M13.1 – Presentation from Bruce Power on the Event Initial Report (PDF, 13 pages, 1142 KB)
- CMD 18-M14 – Event Initial Report for OPG on Darlington Refurbishment Retube Waste Processing Building - Internal Contamination Event (PDF, 5 pages, 2149 KB)
- CMD 18-M15 – Event Initial Report for 20/20 ND Technology Inc. on potential dose limit exceedance for a certified exposure device operator (PDF, 5 pages, 1125 KB)
- CMD 18-M16 – Event Initial Report for 20/20 ND Technology Inc. on industrial radiography vehicle fire - no damage to exposure device (PDF, 9 pages, 1415 KB)
- CMD 18-M18 – Event Initial Report for Windsor Regional Hospital on the exceedance of a regulatory dose limit by a nuclear energy worker (PDF, 4 pages, 293 KB)
- Date modified: